Functional and pressure testing of finished valves on our own bench. Test records are available on request and can ship with the goods.
Batch traceability from incoming material through to the valve serial number.
Datasheets, drawings, test reports and the certificates we hold are provided with the order. If your procurement department needs a specific document, tell us before the order and we will confirm it in writing.
Short, factual answers to the questions buyers and engineers ask most often. Each answer stands on its own.
It is a relief valve on the leg circuit. At a set pressure it opens and lets emulsion return to the tank, so the leg cannot be over-pressurised when the roof loads or the support yields. The set pressure is a safety-critical value and must be confirmed against the support specification, not copied from a similar part.
It holds the leg extended when the supply line is depressurised. A pilot line opens the check when the support is lowered. If a support creeps down slowly while the pump is running normally, the lock valve is the first part to check.
The single lock valves FDD125/50 and FDD80/50, and the cone-type shut-off valve FJZ400/31.5, carry the MA mining product safety mark. The approval numbers are MEE131131 and MEE131132 for the lock valves. Confirm the covered model list against the certificate before ordering.
Powered roof supports run on a water-emulsion mixture, not hydraulic oil. That is why the valves are built with corrosion-resistant bodies and why filtration of the emulsion circuit matters as much as the valves themselves.
FDD designates the product family (pilot-operated check valve, single lock). The 125 and 50 are the model designations used on the nameplate. The exact meaning of each figure is confirmed against the drawing for that model — it is not inferred from the name here.
Yes, in most cases. Send the failed part and it is measured on a coordinate basis, a dimensioned drawing is reconstructed and sent for approval before manufacture. For simple parts such as a manifold block or a blanking plate, photographs with a rule across the ports are often enough to quote.
There is no minimum for a first trial order. A first order is typically a mixed batch of the parts a maintenance team consumes fastest, so quality can be judged before committing to volume.
Usually within one working day. Send the part number, a drawing or a photo of the nameplate together with working pressure and quantity.